    105MW GT4 Double-Post ZAM Coating Steel Project in Bosnia – HQ Mount Provides Full Project Support with 5 On-Site Visits

    Release time:

    2026-08-27

    HQ Mount utility-scale solar power plant 105MW indicates HQ Mount as a solar mounting suppllier's capacity, experience, and performance for large-scale solar mounting systems.

    105MW GT4 Double-Post ZAM Coating Steel Project in Bosnia – HQ Mount Provides Full Project Support with 5 On-Site Visits

    HQ Mount is proud to announce the successful progress of a 105MW solar power plant project in Bosnia and Herzegovina, featuring our HQ-GT4 double-post ZAM coating steel ground mounting system. This utility-scale project represents a major milestone in the Balkan region's renewable energy transition.

    Project & Product Highlights:

    Capacity: 105MW utility-scale solar power plant

    System: HQ-GT4 double-post ground mounting structure – classic, standard, and simple design adaptable to various harsh environments

    Material: High-strength ZAM coating steel (ZAM275 S350GD/450GD) – 2-6x better corrosion resistance than standard galvanization

    Foundation: Pre-drill rocky soil, put a ramming pile inside, and pour concrete into it

    HQ Mount's Full Project Support:

    To ensure the success of this landmark project, HQ Mount has provided comprehensive on-the-ground support, including:

    • 5 dedicated on-site visits – our engineering team traveled to Bosnia multiple times to provide technical guidance, site surveys, and installation support
    • Full project engineering – custom design based on local wind and snow loads
    • Factory pre-assembly testing – every component verified before shipping
    • Site installation guidance – our engineers worked alongside the local installation team
    • Quality assurance – strict QC from raw material to final installation